1. Product Introduction of Preparation rack
Whether it is traditional electrolysis or stainless steel cathode electrolysis, the electrode plate preparation frame must be configured. After the anode is processed by the shaping unit, the qualified anode is placed on the anode preparation rack, which is convenient for slotting and improves the operation speed and efficiency. After being treated, the cathode after stripping also needs to be placed on the cathode preparation rack to prepare for the next grooving.
2. Product Parameter (Specification) of Preparation rack
No. |
Capacity |
1 |
10 pieces |
2 |
15pieces |
3 |
20 pieces |
4 |
25 pieces |
5 |
30 pieces |
6 |
others |
3. Product Feature And Application of Preparation rack
The preparation rack is widely used in electrolytic workshops (copper / lead / zinc) to arrange anode / cathode plates at intervals. Convenient for hoisting to the electrolytic cell.
The spacing between plates can be set to 90mm, 100mm, 110mm and other different specifications according to requirements.
4. Product Qualification of Preparation rack
The main body of the preparation frame is welded by rectangular tubes, which are firmly welded and of sufficient strength. Spray anti-corrosion and anti rust paint.
5. Deliver, Shipping And Serving of Preparation rack
Ensure convenient transportation and do not exceed the size of the container. Ensure delivery time.
6. FAQ
1). How many years have your company made this kind of equipment?
RE: Since 2010.
2). Do you have detailed and professional installation manual?
RE: We provide detailed installation, operation and maintenance instructions.
3). Are you a trading company or a manufacturer?
RE: We are directly design and manufacturing supplier.
4). Can you can design the equipment according to our size?
RE: Sure. We provide non-standard designed and manufactured equipment.
5). How many staff abroad you sent to install the equipment?
RE: Provide 2-3 engineers to guide installation and commissioning. 1-2 mechanical engineers, 1 Automation Engineer.
6). How many days you need to install the equipment?
RE: The equipment specifications and quantities of each project are different, and the normal single unit lasts about 30 days.
Xiangtan Lufeng Machinery Co., Ltd. was established in 2010 and is located in the Industrial Park of Hunan Xiangtan High-tech Zone. Through more than 10 years of precipitation and development, Lufeng company has made many achievements in the design and manufacture of high-quality copper&lead&zinc smelting equipment.
Today, Lufeng has become one of the best manufacturers of high-quality smelting equipment in China and abroad, such as copper&lead smelting furnace, linear ingot casting machine, disc ingot casting machine, lead pot refining system, lead-acid battery crushing and sorting system, copper&lead&zinc electrolysis system, etc.